The other day I received a delivery from the states of all the parts that I will need to complete the cowl area including the lower cowl, wiper transmission, wiper motor mounting , motor and export brace.
Installed the lower cowl using the export black to help line it up due to the previous work done on the car (I use the term "work" pretty loosely) and the repairing of the firewall flange I was not 100% on weather I had left the right holes turns out I had and after opening them up a little and trimming the top edges I was looking good for welding.
Prepping the lower cowl for install removed the e-coat from the area to be welded and sprayed with 2 coats of copper weld-thru primer the punched and drilled the 8mm (5/16") holes rady for plug welding.
Installed lower cowl lined up with reference points and clamped in prep for welding.
And 1 hour 45 minutes later and 75 plug welds, one completed lower cowl.
Plug welds all cleaned up ready for priming with weld thru primer.
Weld thru primer done ready for the rebuild of the upper cowl.
Next will be installing wiper trans to help line up the upper cowl and rebuild the pieces removed in the cowl removal process thanks to the mess of a job done previously.